Basics of BOM/BOM and success points for BOM construction | newji
製造業の見積・発注クラウド

その単価は妥当か。
AI が根拠付きで分析。

相見積の比較も発注も進捗管理も、ひとつの画面に。

サービス資料をダウンロードPDF・無料/1分で受け取れます

投稿日:2025年1月14日

Basics of BOM/BOM and success points for BOM construction

Understanding the Basics of BOM

A Bill of Materials, often abbreviated as BOM, is a comprehensive list detailing all the parts, components, and materials required to construct, manufacture, or repair a product.

Imagine you’re building something as simple as a bicycle.
The BOM would include everything from the frame, wheels, and seat to smaller parts like nuts and bolts.

Each item on the BOM is listed with specific details such as part numbers, quantities, descriptions, and the stages of production where they’re needed.

Why is a BOM Important?

💡 こうした調達・受発注の属人化、Newji one なら「ひとつの画面」で解決。見積依頼から発注・進捗・承認までAIが下支えします。
サービス資料を見る(無料)→

A BOM is crucial for several reasons.

First, it provides a clear blueprint for product creation, ensuring that every necessary piece is accounted for.
Without a detailed BOM, manufacturers risk missing vital components, leading to delays, increased costs, or faulty products.

It also facilitates communication between various teams, such as engineering, purchasing, and manufacturing, by standardizing part descriptions and specifications.

Types of BOM

Not all BOMs are the same.
Different projects require different types of BOMs to suit their unique requirements.

Engineering BOM (EBOM)

An Engineering BOM is developed by an engineering team during the product design phase.
It outlines the design elements, typically in a specific software like CAD, reflecting the intended product design.

Manufacturing BOM (MBOM)

The Manufacturing BOM is created in the manufacturing phase.
It includes those items from the EBOM in addition to the materials required for the assembly process.
This could involve instructions for assembly, machinery settings, or packaging materials.

Sales BOM (SBOM)

A Sales BOM is used primarily in retail or sales environments.
This BOM details items that are sold together, like a kit, where the finished product is considered an assembly of individual parts.
The SBOM helps with pricing and inventory tracking.

Key Components of a BOM

A well-structured BOM is like a well-mapped-out plan.
Here are the critical components:

Part and Description

Each item on a BOM needs a clear and concise description.
This includes the part number, which is a unique identifier for quick reference.

Quantity

The quantity specifies how many of each component are needed for production.
This helps in ordering precise amounts to avoid waste or shortages.

Hierarchy and Levels

BOMs are often hierarchical, meaning they structure parts and components at different levels.
For example, the assembly of a bicycle would be a top-level description, with sub-levels for the wheels, chainring, and handlebars.

Additional Specifications

Extra specifications can include the unit of measure (e.g., inches, kilograms), the procurement type, and any requisite notes for parts that need special handling or assembly instructions.

Success Points for BOM Construction

Constructing an effective BOM involves more than just listing parts.
Here are some key success points:

Accuracy

Accuracy is vital.
Even a small error in part numbers or descriptions can lead to larger issues, such as order delay or production stoppage.
Double-check all details during BOM creation.

Consistency

Consistency in how items are named and described is crucial for maintaining an accurate and easy-to-use BOM.
Consistency helps avoid confusion and ensures that everyone involved in the production process is on the same page.

Regular Updates

Products often undergo design changes or improvements, making it essential to regularly update the BOM.
An outdated BOM can cause problems in the production line when it references incorrect or obsolete parts.

Integration with Supply Chain

To ensure that materials are sourced efficiently, your BOM should be integrated with your supply chain and inventory management systems.
This will help in tracking order statuses and managing stock levels efficiently.

Conclusion

Understanding and implementing a well-structured BOM is vital for successful product manufacturing and assembly.
Whether it’s ensuring accuracy in part numbers, maintaining consistency across descriptions, or regularly updating for design changes, these practices help streamline the production process.

By integrating the BOM with supply chain management, companies can not only meet production deadlines but also manage costs effectively.
A clear and comprehensive BOM is a cornerstone of efficient production systems and successful product management.

WHITE PAPER

この記事の理解を深める
無料ホワイトペーパーをプレゼント

製造業の現場で使える実務資料(PDF)を無料でお届けします。"こんな資料が届きます" ↓ 下のボタンからどうぞ。

FREE DOCUMENT — サービス資料(PDF・無料)

製造業の見積・受発注クラウド
「Newji one」とは

Newji one は、製造業の調達・受発注に特化したクラウド/AIエージェント。見積依頼・発注書作成・進捗管理・承認をひとつの画面に集約し、AIが比較と異常検知を担当。最後の「GO」だけ人が押す仕組みです。

  • 見積〜発注〜納期を一元管理。催促・転記のムダをゼロに
  • AIが相見積もり比較と異常検知。あなたは判断だけに集中
  • 取引先は「招待」で完全無料。自社コストだけで取引先ごとデジタル化

※ 取引先から招待された企業様は完全無料でご利用いただけます

NEWJI総研

購買・調達や設計・品質の実務を、
研修テキストと実務書式にまとめています。
無料サンプルで中身を確かめられます。

NEWJI総研の資料を見る

OEM/ODM 生産委託

アイデアはある。作れる工場が見つからない。
試作1個から量産まで、加工条件に合わせて最適提案します。
短納期・高精度案件もご相談ください。

加工可否を相談する

AI/DX支援

見積・発注、紙・FAX、品質記録など、
人に頼って回っている業務を、AIと仕組みで回る形に。
まずは無料でご相談ください。

AI/DX支援を見る

見積・発注クラウド Newji one

受発注が増えるほど、入力・確認・催促が重くなる。
受発注管理を“仕組み化“して、ミスと工数を削減しませんか。
見積・発注・納期まで一元管理できます。

機能を確認する

You cannot copy content of this page